Applications
Web apps, APIs, background workers repackaged for the new environment.
Migrate from on-prem, Heroku, or a legacy host to AWS, GCP, or Azure with a tested rollback plan, zero data loss, and minimal disruption.
0
Data loss target
−40%
Avg cost after move
4–10
Week migration
Migration isn't always the right first move
Sometimes the smarter play is optimizing where you are. We'll start with an honest audit if a migration won't pay off, our cloud consulting team will tell you straight.
A migration is never "just the app." We handle every layer that has to move with it.
Web apps, APIs, background workers repackaged for the new environment.
Postgres, MySQL, Mongo migrated with replication & zero data loss.
User uploads, media, backups transferred to S3, GCS, or Blob storage.
VPCs, load balancers, domains, SSL re-created and cut over carefully.
Deployment pipelines rebuilt so your team ships the day after cutover.
Environment variables, API keys, certs moved into a proper secret manager.
Not everything should move the same way. We pick the strategy that balances speed, cost, and risk for each piece.
Move as-is to the cloud. Fastest path, minimal changes optimize later.
Best for · Speed · Tight deadlines · Legacy apps
Move with targeted upgrades managed databases, containers, autoscaling.
Best for · Balance of speed & gains · Most clients
Rebuild cloud-native serverless, microservices for max scale & savings.
Best for · Long-term value · Scaling products
Move in stages some workloads now, some later to de-risk big migrations.
Best for · Large systems · Risk-averse teams
A documented, tested, reversible migration not a risky weekend cutover.
Full inventory of what moves, in what order
Step-by-step plan with timing & owners
Tested fallback if anything goes wrong
Diagrams of the new cloud environment
New environment fully in Terraform
Full rehearsal before the real cutover
Row-counts & integrity checks post-move
Alerts & dashboards live before cutover
Your team can operate the new setup
Migrations fail when teams rush the cutover. Our four safeguards make it boring which is exactly what you want.
Old and new environments run side-by-side until the new one is proven.
Your database syncs in real time, so the new environment is always current.
We route 1% → 10% → 50% → 100% of traffic, watching metrics at each step.
If anything looks wrong, we shift traffic back in seconds no harm done.
We rehearse the whole migration in staging before touching production so cutover day is uneventful.
Week 1
01
Inventory, dependencies, strategy
Week 2
02
Runbook, rollback, target architecture
Week 3–5
03
New env, staging dry-run
Week 6
04
Gradual traffic shift, monitor
Week 7
05
Optimize, decommission old, handoff
Migrations range from a single app to a full data center three engagement models cover most.
Engagement 01
2-week diagnostic
Engagement 02
4–10 week project
Engagement 03
3+ month phased program
After a 30-minute discovery call, we send a detailed proposal within 3 business days including assessment summary, recommended strategy, timeline, and a fixed all-in price. Cloud provider costs are paid directly by you, and during parallel-running you'll briefly pay for both environments we keep that overlap as short as safely possible.
01
Free 30-min on current setup & goals.
02
Strategy, timeline, fixed price within 3 days.
03
Assessment starts within 1–2 weeks.
We design for zero user-facing downtime: parallel environments, live database replication, and gradual traffic shift (1% → 100%). Some cutover steps may need a brief maintenance window for DNS or certificates we call those out upfront and schedule them off-peak.
Every project ships with a tested rollback plan. If metrics slip during cutover, we shift traffic back in seconds. Staging dry-runs and rehearsal cutovers catch most issues before production is touched.
Yes. We inventory what's running, read your codebase and infrastructure config, and document as we go. Original authors speed things up when available, but they aren't required for a safe migration.
Typically one to three weeks while old and new run in parallel. We shorten that overlap as much as safety allows and estimate dual-environment cost in your proposal so there are no surprises.
It depends on timeline and goals. Many teams rehost first to exit a bad host quickly, then refactor high-value workloads in a second phase. Your assessment recommends the right split we won't push a big-bang rewrite when lift-and-shift is the smarter play.
Yes. We architect for encryption, access control, audit logging, and data residency, and work with your compliance team on BAAs, PCI scope, and evidence. Migrations preserve controls we don't treat compliance as an afterthought.
Architecture & cost strategy start here if you're not sure migration is right.
Cloud consultingRefactoring during migration? We rebuild cloud-native the right way.
Cloud app developmentJust moved? Tighten the new environment and cut the bill further.
Cost optimizationBook a free 30-minute discovery call. We'll assess your setup and send a migration plan within 3 days.
Book a call