Move to the cloud without the downtime

Migrate from on-prem, Heroku, or a legacy host to AWS, GCP, or Azure with a tested rollback plan, zero data loss, and minimal disruption.

0

Data loss target

−40%

Avg cost after move

4–10

Week migration

FROMon-prem · Heroku123ZERO DOWNTIMETOAWS · GCP · AzureSAFETY CHECKSData verifiedRollback readyLoad tested

you probabaly need cloud migration if...

You're running on aging on-prem servers or a data center you want to leave
Heroku or your current PaaS has gotten too expensive at your scale
You're switching cloud providers AWS to GCP, Azure to AWS, etc.
You need to migrate but can't afford downtime or data loss

Migration isn't always the right first move

Sometimes the smarter play is optimizing where you are. We'll start with an honest audit if a migration won't pay off, our cloud consulting team will tell you straight.

Six things that move during a migration

A migration is never "just the app." We handle every layer that has to move with it.

Applications

Web apps, APIs, background workers repackaged for the new environment.

Databases

Postgres, MySQL, Mongo migrated with replication & zero data loss.

Files & storage

User uploads, media, backups transferred to S3, GCS, or Blob storage.

Networking & DNS

VPCs, load balancers, domains, SSL re-created and cut over carefully.

CI/CD & pipelines

Deployment pipelines rebuilt so your team ships the day after cutover.

Secrets & config

Environment variables, API keys, certs moved into a proper secret manager.

The right strategy per workload

Not everything should move the same way. We pick the strategy that balances speed, cost, and risk for each piece.

01

Rehost ("lift & shift")

Move as-is to the cloud. Fastest path, minimal changes optimize later.

Best for · Speed · Tight deadlines · Legacy apps

02

Replatform ("lift & reshape")

Move with targeted upgrades managed databases, containers, autoscaling.

Best for · Balance of speed & gains · Most clients

03

Refactor ("re-architect")

Rebuild cloud-native serverless, microservices for max scale & savings.

Best for · Long-term value · Scaling products

04

Hybrid & phased

Move in stages some workloads now, some later to de-risk big migrations.

Best for · Large systems · Risk-averse teams

Every migration includes

A documented, tested, reversible migration not a risky weekend cutover.

Migration assessment

Full inventory of what moves, in what order

Migration runbook

Step-by-step plan with timing & owners

Rollback plan

Tested fallback if anything goes wrong

Target architecture

Diagrams of the new cloud environment

Infrastructure as Code

New environment fully in Terraform

Staging dry-run

Full rehearsal before the real cutover

Data validation

Row-counts & integrity checks post-move

Monitoring setup

Alerts & dashboards live before cutover

Handoff & training

Your team can operate the new setup

How we move you without breaking things

Migrations fail when teams rush the cutover. Our four safeguards make it boring which is exactly what you want.

01

Parallel running

Old and new environments run side-by-side until the new one is proven.

02

Live data replication

Your database syncs in real time, so the new environment is always current.

03

Gradual traffic shift

We route 1% → 10% → 50% → 100% of traffic, watching metrics at each step.

04

Instant rollback

If anything looks wrong, we shift traffic back in seconds no harm done.

Tools we migrate with

AWS DMSAWS MGNGCP MigrateAzure MigrateTerraformDockerKubernetespgloaderCloudflareDatadogVelero

From assessment to cutover in 5 phases

We rehearse the whole migration in staging before touching production so cutover day is uneventful.

Week 1

01

Assess

Inventory, dependencies, strategy

Week 2

02

Plan

Runbook, rollback, target architecture

Week 3–5

03

Build & rehearse

New env, staging dry-run

Week 6

04

Cutover

Gradual traffic shift, monitor

Week 7

05

Stabilize

Optimize, decommission old, handoff

Find the engagement that fits

Migrations range from a single app to a full data center three engagement models cover most.

Engagement 01

Migration Assessment

2-week diagnostic

  • Full infrastructure inventory
  • Recommended strategy
  • Target architecture
  • Cost & timeline estimate
  • Risk & rollback plan
Request a quote
Most common

Engagement 02

Full Migration

4–10 week project

  • End-to-end migration
  • App + database + storage
  • Staging dry-run rehearsal
  • Zero-downtime cutover
  • Monitoring + IaC
  • 60-day post-migration support
Request a quote

Engagement 03

Enterprise Migration

3+ month phased program

  • Multi-system phased move
  • Data center exit
  • Refactor where it pays off
  • Compliance preserved
  • Dedicated migration team
  • Ongoing optimization
Request a quote

Every migration is different so is every quote

After a 30-minute discovery call, we send a detailed proposal within 3 business days including assessment summary, recommended strategy, timeline, and a fixed all-in price. Cloud provider costs are paid directly by you, and during parallel-running you'll briefly pay for both environments we keep that overlap as short as safely possible.

01

Discovery call

Free 30-min on current setup & goals.

02

Custom proposal

Strategy, timeline, fixed price within 3 days.

03

Kickoff

Assessment starts within 1–2 weeks.

Things teams ask before migrating

We design for zero user-facing downtime: parallel environments, live database replication, and gradual traffic shift (1% → 100%). Some cutover steps may need a brief maintenance window for DNS or certificates we call those out upfront and schedule them off-peak.

Every project ships with a tested rollback plan. If metrics slip during cutover, we shift traffic back in seconds. Staging dry-runs and rehearsal cutovers catch most issues before production is touched.

Yes. We inventory what's running, read your codebase and infrastructure config, and document as we go. Original authors speed things up when available, but they aren't required for a safe migration.

Typically one to three weeks while old and new run in parallel. We shorten that overlap as much as safety allows and estimate dual-environment cost in your proposal so there are no surprises.

It depends on timeline and goals. Many teams rehost first to exit a bad host quickly, then refactor high-value workloads in a second phase. Your assessment recommends the right split we won't push a big-bang rewrite when lift-and-shift is the smarter play.

Yes. We architect for encryption, access control, audit logging, and data residency, and work with your compliance team on BAAs, PCI scope, and evidence. Migrations preserve controls we don't treat compliance as an afterthought.

Ready to move safely?

Book a free 30-minute discovery call. We'll assess your setup and send a migration plan within 3 days.

Book a call